Chessington World of Adventures- Wanyama Climbing Area

Well this was an exciting one to be involved with… what started as a tired/rotten meerkat enclosure has been transformed into a new impressive play area. We were tasked with demolishing the old walls and hut, excavating the existing surface and laying a new compacted sub-base. Concrete edgings were installed to retain the new surface, […]

Lyne, Chertsey- Drainage, Kerbing & Surfacing Project

This project involved constructing a new tarmac road for a logistics company in Chertsey. Drainage was installed to remove surface water and kerbs to both sides of the road. A full 200mm thick 3 layer construction of tarmac was laid to ensure the new road could handle regular HGV traffic. We were also tasked with […]

CWOA- Post & Rail Fencing

Recently completed 600m of post and rail fence replacement to this car park. The original rotten fence was removed and posts extracted using a grapple attachment for our 8 tonne excavator. We then used a hydraulic post driving attachment to install the new posts. Rails were then fixed to the posts before moving onto the […]

Concrete Hardstanding- Chertsey

Another concrete hardstanding with drainage completed. Using our 8 tonne excavator we reduced the levels to 0.5m then laid a new 0.3m thick sub base with a reinforced concrete slab 0.2m thick. Heavy duty drainage channels were installed meaning this area will soon (after sufficient curing time) be ready for HGV’s and forklifts. For the […]

CWOA Explorer Entrance

This project involved the complete overhaul of the existing entrance area which was completed over several phases. With much of this work carried out during the open season, careful planning and huge efforts from every team member involved enabled it to be delivered with minimal disruption to the parks operation. To summarise a project with […]

CWOA Jumanji Land- Structural Works

The team have worked tirelessly on this large project to complete the structural works on the exciting new land due to open in 2023. Works included clearance, bulk excavations, piling platforms, pile caps, ride bases, in situ concrete works and forming roads. The team are now moving onto drainage, ducting and external works which will […]

Fulham Football Club- Former BBC Sports Ground Demolition

Working on the former BBC site we were tasked with demolishing the remains of the burnt down pavilion building. This included clearing the area of vegetation and rubbish. The team then began breaking the concrete floor, exposing suspected hidden basements as they worked their way into the building. Works included removal of below ground services, […]

Windsor- Trenching, Duct Installation & Reinstatement

Our team recently undertook a small project which highlights our meticulous approach to trenching works and they completed it so well you wouldn’t know we had been there! The task involved installing three 4-inch ducts through a block-paved area, connecting an existing chamber to a newly installed one, and extending from there to a new […]

CWOA Jumanji Land- Groundworks

In February 2022 we started the Groundworks for the new Jumanji land at chessington. This new land has recently opened to the public and what a fantastic project to be involved with. An incredible effort from every single one of our guys to deliver the Groundworks for such a unique attraction. To transform this basic […]